860.548.0802 Connecticut | 401.596.7555 Rhode Island
© 2017 Tecton Architects, PC. | Copyright
860.548.0802 Connecticut | 401.596.7555 Rhode Island
© 2017 Tecton Architects, PC. | Copyright
West Natick Fire Station #4 - Natick, MA
Natick’s Fire Station #4 supports the largest call volume within the town and responds to calls within other districts as needed. This workload, combined with planned development in the area, necessitates a new station to enable fast response times and provide adequate equipment and apparatus storage.
Tecton’s design includes living quarters and supporting amenities, training rooms and tower for shared use with other districts, five double-deep apparatus bays and rooftop solar panels. It also includes a Watch Room to act as backup dispatch to Headquarters and will also be the new Emergency Operations Center during the Boston Marathon.
A community pocket park and shared bike path will be built following demolition of the existing building on the site, connecting both the station and neighborhood to amenities.
Strengthening Connection to Community